Excel Exhibition Centre

London E16

Home   /   Services   /  All Projects   /  detail

IES Consulting performed the Part L compliance assessment for Phase 2 of the Excel Exhibition Centre, London.

Key Facts

  • Performed Part L Compliance Assessment

By creating a detailed 3D geometric model to represent the additional exhibition space, IES were in a position to apply the detailed thermal attributes and then report a detailed energy breakdown of the expected energy and carbon use. The ability to view such a detailed results display provided IES with the ability to report on oppurtunities to reduce the energy usage and optimise the design.

Project Gallery