Preparing for Ireland's Updated BER Scale: How IESVE Compliance supports the next phase of EPBD implementation
October 13th 2026

Preparing for Ireland's Updated BER Scale: How IESVE Compliance supports the next phase of EPBD implementation

Ireland's Building Energy Rating (BER) scale is undergoing rapid change. As part of the recast Energy Performance of Buildings Directive (EPBD), member states are required to update how they calculate, certify, and communicate the energy performance of buildings. For architects, engineers, and energy assessors, three articles of the Directive sit at the heart of the change:

  • Article 4 requires a revised methodology for calculating building energy performance, bringing Ireland's approach in line with the latest EU framework.
  • Article 5 sets updated minimum energy performance requirements that new and renovated buildings must meet.
  • Article 19 governs how Energy Performance Certificates are produced and presented, directly reshaping the BER scale that clients, tenants, and buyers rely on to understand a building's performance.

Taken together, these changes mean compliance teams need to recalibrate not just their calculations, but the software and workflows behind them, often against a tight statutory deadline. 

How IES are ahead of the curve 

IES has been working to ensure project teams in Ireland can meet the updated methodology without disrupting live projects. In the near term, this has meant providing easy to use guidance that reflects the new BER scale and Article 4/5 calculation requirements, so compliance work can continue uninterrupted as the legislation takes effect. 

Longer term, this capability is being built directly into IESVE Compliance, our dedicated compliance modelling application, with a planned release in late 2026. This gives teams a clear path: continue working today on the interim interface, then move to a fully integrated VE Compliance workflow once it's available, without having to change modelling platforms or re-learn a new tool. 

The result is a single, consistent modelling environment that carries teams through the transition, from today's interim requirements through to the long-term Article 19 certification standard. 

asset_image What this looks like in practice 

IES is already working with a range of project teams across Ireland to apply the updated methodology to live projects, from initial compliance assessments through to identifying practical routes to higher-performing, lower-carbon buildings. And while we can’t reveal all the details due to commercial sensitivities, the results speak for themselves.

asset_image

Fig 2: Example of IESVE compliance analysis 

Office located in Blanchardstown, Dublin
 

This project demonstrates how the revised BER methodology can help building owners understand the energy and performance impact of proposed improvements before making investment decisions. The assessment established a baseline B BER rating, with annual primary energy consumption of 120 kWh/(m².yr). 

The project evaluated a range of Energy Conservation Measures, including improvements to air tightness, lighting systems, energy monitoring, HVAC plant and renewable energy generation. Results showed that relatively straightforward interventions, including power factor correction and improved air tightness, were sufficient to move the building from a B rating into the A band. More comprehensive upgrade packages delivered even greater improvements. 

The most significant benefits were achieved through combined lighting, HVAC and renewable energy measures. These reduced annual primary energy demand from 120 kWh/(m².yr) to 58 kWh/(m².yr) representing a 52% reduction compared with the baseline building while maintaining an A BER rating. Implementing all proposed measures reduced annual primary energy demand further to 52 kWh/(m².yr), delivering an overall 57% improvement compared with the original assessment. 

The study also highlighted the contribution renewable energy can make under the revised framework, with solar PV alone reducing annual primary energy demand to 79 kWh/(m².yr) while achieving an A-rated building. 

Outcome: This project demonstrates how the updated BER methodology can be used not only to demonstrate compliance but also to identify the most effective combination of efficiency measures, providing a practical and evidence-based route from a B-rated building to a significantly higher-performing A-rated asset. 

Moving forward 

The transposition deadline was set for 24th May 2026, which meant that project teams across Ireland had a narrow window to align their compliance workflows with the updated methodology. IES's phased approach, interim interface now, full VE Compliance integration to follow, was designed to remove pressure, giving teams a stable route through the transition and beyond rather than a last-minute scramble. 

The work with other project teams that IES continues to support across Ireland, demonstrates that adapting to the revised BER methodology is about more than maintaining compliance. By combining accurate performance modelling with a clear understanding of EPBD requirements, project teams can use the transition as an opportunity to improve building performance, reduce operating costs, lower emissions and create long-term decarbonisation strategies. 

IESVE is our dynamic simulation platform for building performance analysis, used by architects, engineers and consultants worldwide to model energy performance, comfort and compliance from early design through certification. VE Compliance extends this capability with a dedicated workflow for regulatory and code compliance, including the methodology introduced under the recast Energy Performance of Buildings Directive (EPBD). 

See our next blog which describes our work supporting SEAI's EBPD Article 19.